Sludge pyrolysis and energy utilization complete system equipment

26-04-2023

Project designed processing capacity of 30 t/d (moisture content 80%), core pyrolysis system covers an area of 300 square meters, 30kW installed power, sludge carbonization time is 60 minutes, exhaust gas emitted after being treated to the standard.





<< Back